Repair of Opel Corsa C, from 2000 to 2005 release.
1. Operation and maintenance of the car
2. Engine
2.1. Petrol Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I engines
2.2. Mechanical part of petrol Z10XE, Z10XEP, Z12XE, Z12XEP DOHC-I engines
2.3. Cooling system
2.4. Lubrication system
2.5. System of injection
2.5.1. Replacement of fuel nozzles (one or all) (Z10XE, Z10XEP, without conditioner)
2.5.2. Replacement of the fuel filter (petrol engines)
2.5.3. Removal and installation of the electric fuel pump
2.5.4. Replacement of consolidation of a final collector (Z10XE, Z10XEP, without conditioner)
2.6. Petrol engines – the general procedures of check
2.7. Mechanical part of the engine
2.8. Test and repair operations of components of a mechanical part of the engine
2.9. Cooling system
2.10. System of injection of fuel of petrol engines
2.11. Lubrication system
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Schemes of electric equipment
 





0653563c

2-5-4-zamena-uplotneniya-vypusknogo-kollektora-z10xe-z10xep-bez-kondicionera.html

2.5.4. Replacement of consolidation of a final collector (Z10XE, Z10XEP, without conditioner)

NOTE
On cars since a year of release 04 with ESP – after each detachment of the accumulator the sensor of an angle of rotation of a steering wheel loses the main installation. It needs to be calibrated anew.

Removal
Open a cowl.
Disconnect plugs of the rechargeable battery.
Disconnect a weight wire.
Lift the car.
Dismantle an exhaust pipe in front 1.

NOTE
On option of the ECO model uncover motor office below.

Turn off 3 nuts.
Lower the car.
Dismantle the soaking-up pipe 1.
Turn out a bolt 2.
Release the directing oil meter probe tube.
Pull out the oil meter probe.
Turn out a bolt.
Dismantle heated a lambda sensor of regulation of composition of fuel mix.
Disconnect the socket of a plait of wires.
Release a plait of wires.
Carefully turn out by means of KM-61291 adaptation.
Dismantle a transport earring of the engine 2 at the left.
Turn out a bolt.
Dismantle a guard of a final collector.
Turn off 2 bolts of fastening.
Dismantle a final collector.
Turn off 7 nuts of fastening.
Take out consolidation.
Clean sealing surfaces of a head of the cylinder and a final collector.
Take out the directing oil meter probe pipe.
Installation
Insert the directing oil meter probe tube.
Replace 2 sealing rings 1.
Establish a final collector.
Replace consolidation.
Replace nuts.
Tighten 3 nuts the moment of an inhaling of 20 N · m.
Establish a guard of a final collector.
Tighten 2 bolts of fastening with the moment of 8 N · m.
Establish a transport earring of the engine at the left.
Tighten a bolt the moment of an inhaling of 20 N · m.
Establish heated a lambda sensor of regulation of composition of fuel mix.
Apply on a carving assembly paste (white).
Tighten a lambda sensor the moment 40 N · m.
Connect the socket of a plait of wires.
Fix a plait of wires.
Fix the directing oil meter probe tube.
Tighten a bolt the moment of 8 N · m.
Lift the car.
Establish an exhaust pipe in front.

NOTE
On the ECO model establish a cover of motor office below.

Replace consolidation and nuts.
Tighten 3 nuts the moment of 25 N · m.
Lower the car.
Establish the soaking-up pipe.
Insert into a forward part from above.
Tighten a bolt.
Insert the oil meter probe.
Connect plugs of the rechargeable battery.
Program volatile memory.
Close a cowl.

"on the page back
2.5.3. Removal and installation of the electric fuel pump
on the following page"
2.6. Petrol engines – the general procedures of check